白鹤滩水电站左岸地下厂房岩壁吊车梁承载特性分析
引用本文:叶辉辉,李良权,方丹,补约依呷.白鹤滩水电站左岸地下厂房岩壁吊车梁承载特性分析[J].水电能源科学,2020,38(1):94-98.
作者姓名:叶辉辉  李良权  方丹  补约依呷
作者单位:中国电建集团华东勘测设计研究院有限公司,浙江杭州,311122
基金项目:国家自然科学基金项目(51309243)
摘    要:岩壁吊车梁是地下厂房重要的支撑结构,其安全稳定性尤为关键。基于原型观测结果,分析了受到洞室开挖卸荷作用和吊车荷载作用下岩梁锚杆受力、岩梁与围岩结合面情况和围岩变形情况,对岩壁吊车梁进行承载特性分析和安全稳定评价。结果表明,围岩开挖卸荷引起岩体较大的深部变形和应力调整,岩梁锚杆应力水平较高,在开挖完成后,各监测数据趋于稳定;锚杆应力值、锚索荷载未超过设计强度;岩梁与岩壁最大开合度1.24mm;岩梁荷载试验期间,各观测数据增量均较小。总体上,岩壁吊车梁安全稳定,能够满足生产运行要求。

关 键 词:白鹤滩水电站  岩壁吊车梁  原型观测  承载特性

Bearing Behavior Analysis of Rock-Bolted Crane Beam in Underground Powerhouse on the Left Bank of Baihetan Hydropower Station
Affiliation:(PowerChina Huadong Engineering Corporation Limited,Hangzhou 311122,China)
Abstract:The rock-bolted crane beam is an important supporting structure in underground powerhouse,so the safety and stability is especially important.Based on the prototype observation,anchor bar stress,attachment of its two crane beams to the surrounding rock and the deformation status of surrounding rock were analyzed with safety monitoring at its excavation stage and the crane load.The stress characteristics and stability of the rock-bolted crane beam were evaluated.The results show that the large deformation and stress adjustment of rock mass caused by the excavation unloading of surrounding rock,the deformation of surrounding rock is large,the stress level of anchor bar is high.After the excavation is completed,the monitoring data tend to be stable.All the bolt stresses are below the yield strength of steel,and the maximum joint opening between the girders and their surrounding rock is 1.24 mm.During the load test,the increment of each observation data is not large.In general,the rock-bolted crane beam is safe and stable,and can meet the production and operation requirements.
Keywords:Baihetan hydropower station  rock-bolted crane beam  prototype observation  bearing behavior