万家寨引黄工程北干线1号隧洞主要工程地质问题及施工对策
引用本文:曹催晨. 万家寨引黄工程北干线1号隧洞主要工程地质问题及施工对策[J]. 山西水利科技, 2004, 0(1): 22-24
作者姓名:曹催晨
作者单位:山西省万家寨引黄工程管理局
摘    要:万家寨引黄工程北干线l号隧洞,长43.9km,已完成5.47km,其余洞段即将施工。该隧洞埋深较大,且大部洞身位于区域地下水位以下,工程地质条件极为复杂,通过充分分析其工程地质问题。提出隧洞掘进施工时策。

关 键 词:万家寨引黄工程  隧洞  工程地质  土洞  围岩工程
文章编号:1006-8139(2004)01-22-02
修稿时间:2003-09-17

The Main Problems of Engineering Geology And The Construction Strategies of No.1 Tunnel in The North Main Line of Wanjiazhai YRDP
Cao Cuichen. The Main Problems of Engineering Geology And The Construction Strategies of No.1 Tunnel in The North Main Line of Wanjiazhai YRDP[J]. Shanxi Hydrotechnics, 2004, 0(1): 22-24
Authors:Cao Cuichen
Affiliation:Cao Cuichen
Abstract:The No.1 tunnel in the north main line of Wanjiazhai YRDP is 43.9 km long. 5.47 km of it has been completed. The construction of the remainder is going to be constructed. The buried position deep; the main part of the tunnel is below the level of ground water. So the engineering geology situation is quite complicated. By the detailed analysis of engineering geology, the construction methods of tunnel driving are brought forward.
Keywords:north main line tunnel geologic situation construction method