预应力梁张拉前拆模质量问题处理
引用本文:吴文彬. 预应力梁张拉前拆模质量问题处理[J]. 福建建设科技, 2008, 0(6)
作者姓名:吴文彬
作者单位:福建省建筑科学研究院
摘    要:通过采取应急措施、理论验算、荷载试验等步骤,本文介绍了预应力梁张拉前拆模所引起的质量问题的处理方法和处理结果,可为类似工程质量问题处理提供借鉴。

关 键 词:预应力梁  质量问题  理论验算  荷载试验

The Quality Problem Disposal of Prestressed Concrete Beam in Dismantled Formwork prior to drawing
Wu Wen-bin. The Quality Problem Disposal of Prestressed Concrete Beam in Dismantled Formwork prior to drawing[J]. Fujian Construction Science & Technology, 2008, 0(6)
Authors:Wu Wen-bin
Abstract:Including emergency measure,theory calculation,load test,this article introduces the disposal method and disposal result on the quality problem of prestressed concrete beams which were dismantled formwork prior to drawing.And it can be provided reference to similar problem.
Keywords:prestressed concrete beam  quality problem  theory calculation  load test