红透山铜矿井下废石破碎充填系统评述
引用本文:吕波. 红透山铜矿井下废石破碎充填系统评述[J]. 有色矿冶, 2001, 17(5): 5-7
作者姓名:吕波
作者单位:抚顺红透山铜矿,辽宁抚顺,113321
摘    要:为了解决井下充填料不足,并降低生产成本,在井下建立了废石破碎充填系统,井下掘进产生的废石破碎为一定粒度后,再依靠水力输送到待充填地点,开创了国内井下废石废填的新工艺,在实际生产中取得良好效果。

关 键 词:井下 废石 破碎 充填系统 铜矿床 采矿
文章编号:1007-967X(2001)05-0005-03
修稿时间:2001-08-20

The Introduction of Waste-Rock Crushing and Filling System in the Underground at Hongtoushan Copper Mine
LU Bo. The Introduction of Waste-Rock Crushing and Filling System in the Underground at Hongtoushan Copper Mine[J]. Non-Ferrous Mining and Metallurgy, 2001, 17(5): 5-7
Authors:LU Bo
Abstract:Because of the lack of filling materials, and to reduce the production cost, a waste rock filling system in the underground was constructed. In this system, the waste rock produced by digging will be crushed according to definite particulate, and then were carried to the spots that need to be filled depend on the hydrodynamic system. This technology is a new invention for the underground filling in our country. It has been obtained obvious effect in practical production.
Keywords:underground  waste rock  crushing  filling system