首页 | 本学科首页   官方微博 | 高级检索  
     

某静压高强预应力管桩工程施工中的断桩原因分析与处理措施
引用本文:魏尚华.某静压高强预应力管桩工程施工中的断桩原因分析与处理措施[J].重庆建筑,2011,10(2):40-43.
作者姓名:魏尚华
作者单位:湖南大学,湖南,长沙,410082
摘    要:高强预应力管桩是近年来在建筑桩基工程广泛应用的一种新型桩基形式,本文结合工程实例,详细阐述了预应力管桩静压法施工工艺,对成桩质量检测及存在问题桩的原因分析及处理措施进行了深入探讨,并提出了一些合理建议,供同行借鉴参考。

关 键 词:高强预应力管桩  静压法  断桩处理  低应变检测法

Cause Analysis and Measures of Broken Pile in the Construction of A Certain Isostatic Pressing Highly-Prestressed Pipe Pile Project
Authors:Wei Shang-hua
Abstract:Highly-prestressed pipe pile is a new pile foundation form that is widely adopted in construction pile foundation projects in recent years.This article,based on practice,first elaborates the construction technology of prestressed pipe piles in isostatic pressing way,and then investigates the quality testing of the completed piles and the causes and measures of existing questionable piles.It also presents some advisable suggestions for the references of the readers.
Keywords:prestressed pipe pile  isostatic pressing method  disposition of the broken pile  low strain assay
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号