首页 | 本学科首页   官方微博 | 高级检索  
     

高地应力隧道开挖过程中围岩稳定性分析
引用本文:焦国良,王卫.高地应力隧道开挖过程中围岩稳定性分析[J].山西建筑,2010,36(26):287-288.
作者姓名:焦国良  王卫
作者单位:成都理工大学,四川,成都,610059
摘    要:利用数值分析方法及FLAC3D软件对方斗山深埋隧道开挖进行数值模拟研究,分析了高地应力下隧道开挖围岩位移变化规律,指出了高地应力条件下围岩变化规律与常规条件下的不同,为指导施工提供了科学依据。

关 键 词:高地应力  围岩稳定性  数值模拟

Analysis on the stability of surrounding rocks in the process of the excavation of high ground stress tunnel
JIAO Guo-liang,WANG Wei.Analysis on the stability of surrounding rocks in the process of the excavation of high ground stress tunnel[J].Shanxi Architecture,2010,36(26):287-288.
Authors:JIAO Guo-liang  WANG Wei
Affiliation:JIAO Guo-liang WANG Wei
Abstract:In the article uses the numerical analysis method and FLAC3D software to research Fangdou mountain bury tunnel excavation to conduct the value simulator study deeply, has analyzed under the high crustal stress the tunnel excavation adjacent formation displacement change rule, had pointed out under the high crustal stress condition under the adjacent formation change rule and the conventional condition difference, has provided the scientific basis for the instruction construction.
Keywords:high gecstress  surrounding rock stability  numerical simulation
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号