首页 | 本学科首页   官方微博 | 高级检索  
     


A simulation analysis of the effectiveness of drum-buffer-rope scheduling in furniture manufacturing
Authors:Shih-Yun Wu  John S Morris  Thomas M Gordon
Affiliation:

1 Forestry Department, Institute of I-Lan A & T, I-Lan, Taiwan, R.O.C.

2 College of Business and Economics, University of Idaho, Moscow, ID 83843, USA

c College of Forestry, Wildlife and Range Science, University of Idaho, Moscow, ID 83843, U.S.A.

Abstract:Simulation has proven to be an important computer tool in analyziing new manufacturing approaches. In this paper we use simulation models to compare a new approach to manufacturing with current practices. The new approach is referred to as the Drum-Buffer-Rope (DBR) method of synchronous manufacturing. We discuss the DBR approach and demonstrate the application of DBR in a furniture manufacturing case example. Simulation models are used to compare the DBR approach with the typical system of production control referred to as a cutting approach. The simulation analysis indicates considerable savings in makespan are possible when DBR is used in place of the cutting approach.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号