首页 | 本学科首页   官方微博 | 高级检索  
     

李家峡水电站拱坝强震监测台阵的布设
引用本文:傅朝阳,郭永刚. 李家峡水电站拱坝强震监测台阵的布设[J]. 水电自动化与大坝监测, 2004, 28(2): 42-44,61
作者姓名:傅朝阳  郭永刚
作者单位:中国水利水电科学研究院工程抗震研究中心,北京市,100044
摘    要:对黄河上游李家峡水电站强震安全监测台阵布设的技术方案进行了详细阐述,内容包括场地的工程概况、台站场址的地址条件、台站的设计、仪器的性能指标及现场施工的具体情况、数据的采集分析等,可供其他大坝强震监测台阵设计时参考。

关 键 词:强震监测 水电站 拱坝 台阵

STATIONING OF STRONG EARTHQUAKE MONITORING STATION OF LIJIAXIA HYDROPOWER STATION ARCH DAM
Fu Chaoyang,Guo Yonggang. STATIONING OF STRONG EARTHQUAKE MONITORING STATION OF LIJIAXIA HYDROPOWER STATION ARCH DAM[J]. HYDROPOWER AUTOMATION AND DAM MONITORING, 2004, 28(2): 42-44,61
Authors:Fu Chaoyang  Guo Yonggang
Abstract:The technical schemes of the strong earthquake monitoring station of Lijiaxia Hydropower Station, which is located on the upper reaches of the Yellows River, are illustrated in detail, including the general situation of the project, the geologic structure near the monitoring station, the design of the monitoring station, the performance indexes of the apparatus, the condition of the construction location, data acquisition and analysis, etc.
Keywords:strong earthquake monitoring  hydropower station  arch dam  station  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号