首页 | 本学科首页   官方微博 | 高级检索  
     

龙滩水电站枢纽布置及重大问题研究
引用本文:冯树荣. 龙滩水电站枢纽布置及重大问题研究[J]. 水力发电, 2003, 29(10): 37-40
作者姓名:冯树荣
作者单位:中南勘测设计研究院,湖南,长沙,410014
摘    要:龙滩水电站是红水河上的“龙头”电站,该工程以发电为主,兼顾防洪和航运,具有巨大的综合利用与规模经济效益。其装机容量初期为4900MW,最终为6300MW,枢纽布置从部分坝后厂房加部分地下厂房方案优化为左岸全地下厂房方案,工期提前1年,效益巨大。拦河大坝采用碾压混凝土重力坝,最大坝高初期为:192m,最终为216.5m,是目前世界上最高的碾压混凝土重力坝。

关 键 词:枢纽布置 碾压混凝土坝 龙滩水电站
文章编号:0599-9342(2003)10-0037-04
修稿时间:2003-09-27

Study on the general layout and key technical issues of Longtan Hydropower Project
FENG Shu-rong. Study on the general layout and key technical issues of Longtan Hydropower Project[J]. Water Power, 2003, 29(10): 37-40
Authors:FENG Shu-rong
Abstract:The Longtan Hydropower Project is a key project in the cascade development of the Hongshui River. The Project is a multi-purpose hydro scheme with power generation as its primary purpose concurrent with flood control and navigation benefits. The project has an installed capacity of 4900 MW in the first stage with a planned expansion to 6300 MW in the second stage. All underground powerhouse is arranged in the left bank, which makes the construction period to be shortened one year ahead of time. The RCC gravity dam with a height of 192m in the first stage and 216.5m in the second stage will be the highest RCC dam in the world.
Keywords:general layout   RCC   Longtan Hydropower Project
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号