预应力锚索抗滑桩的改进计算方法
引用本文:刘小丽,张占民,周德培. 预应力锚索抗滑桩的改进计算方法[J]. 岩石力学与工程学报, 2004, 23(15): 2568-2572
作者姓名:刘小丽  张占民  周德培
作者单位:1. 中国科学院武汉岩土力学研究所岩土力学重点实验室,武汉,430071
2. 河北省第四建筑工程公司第六分公司,保定,071051
3. 西南交通大学岩土工程系,成都,610031
基金项目:国家重点基础研究发展规划(973)资助项目(2002CB412700)。
摘    要:针对现有预应力锚索抗滑桩计算中存在的问题,提出了改进计算方法,即根据预应力锚索抗滑桩的实际施工过程和受力条件分阶段计算,特别在第1阶段计算预应力作用下抗滑桩的内力时应该考虑桩后滑面以上岩土体的反力作用。通过算例对现有计算方法和改进计算方法的计算结果进行分析比较,并通过与抗滑桩实测内力结果的对比分析表明,改进计算方法由于理论上的合理性使其计算结果更接近实测值,这对预应力锚索抗滑桩在滑坡整治工程中的合理设计具有重要意义。

关 键 词:岩石力学 预应力锚索 抗滑桩 弹性地基梁 地基抗力
文章编号:1000-6915(2004)15-2568-05
收稿时间:2002-12-20
修稿时间:2003-03-21

IMPROVED METHOD FOR COMPUTING ANTI-SLIDING PILE WITH PRESTRESSED ANCHORING CABLE
Liu Xiaoli,Zhang Zhanmin,Zhou Depei. IMPROVED METHOD FOR COMPUTING ANTI-SLIDING PILE WITH PRESTRESSED ANCHORING CABLE[J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 23(15): 2568-2572
Authors:Liu Xiaoli  Zhang Zhanmin  Zhou Depei
Affiliation:Liu Xiaoli1,Zhang Zhanmin2,Zhou Depei3
Abstract:Aiming at the existing problems in the method for computing anti-sliding pile with prestressed anchoring cable,an improved method is proposed in this paper. According to the actual construction process and mechanical condition of the pile and the prestressed anchoring cable,the internal force of the structure should be computed in two steps. Firstly,the pile under the prestress of the anchoring cable and a part of sliding thrust will be taken into account in computation. It should be pointed out that the subgrade reaction over the slip surface behind the pile should also be taken into consideration in the calculation of the prestress. Secondly,the pile under the computed sliding thrust should be calculated and the concerted deformation of the pile and the anchoring cable must be considered. A model test on the character of the internal force of prestressed anti-sliding pile is conducted,and the pile is calculated using the improved method and the existing method. The comparison between the computation results and the test results shows that the satisfying results can be obtained by the improved method.
Keywords:rock mechanics  prestressed anchoring cable  anti-sliding pile  elastic foundation beam  subgrade reaction  deformation consistence