下福水利枢纽110kV母线改造设计与施工
引用本文:陈其中.下福水利枢纽110kV母线改造设计与施工[J].广西水利水电,2009(5):36-38.
作者姓名:陈其中
作者单位:广西昭平桂海电力有限责任公司,广西,昭平,546800
摘    要:下福水电站投产后,由于周边的电力供应市场及网架结构发生了较大变化,为了适应市场要求,通过分析比较,对主接线110kV母线进行分段技术改造。论述了技改的方案、过程及改造后电站运行的可靠性及发供电的灵活性。

关 键 词:母线分段  GIS设备  技术改造  下福水电站

110 kV bus upgrade design and implementation of Xiafu Hydraulic Complex
CHEN Qi-zhong.110 kV bus upgrade design and implementation of Xiafu Hydraulic Complex[J].Gx Water Resources & Hydropower Engineering,2009(5):36-38.
Authors:CHEN Qi-zhong
Affiliation:CHEN Qi-zhong (Guangxi Zhaoping Guihai Electric Power Co., Ltd., Zhaoping 546800, China)
Abstract:The electric power market and grid structure changed a lot after Xiafu Hydraulic Complex was put into operation. In order to satisfy the requirements of market, the 110kV bus was altered to be sectionalized bus after analysis and comparison. An introduction was made on the technical upgrade scheme, the implementation process, the operation reliability and flexibility of the hydropower station after the upgrade.
Keywords:Sectionalized bus  GIS  technical upgrade  Xiafu Hydraulic Complex