自强水电站初步设计综述 |
| |
引用本文: | 吴正新,后开祥.自强水电站初步设计综述[J].水电勘测设计,2007(1):7-9. |
| |
作者姓名: | 吴正新 后开祥 |
| |
作者单位: | 中国水电顾问集团贵阳勘测设计研究院,贵州贵阳550002 |
| |
摘 要: | 自强水电站于2005年2月通过初步设计报告审查。本电站是以发电为主兼顾防洪排涝的筑坝引水式水电站。通过对坝址坝型、厂址、引水系统进行了综合比较,最终采用“毛石混凝土重力坝+自由溢流式泄洪+右岸引水系统+地面厂房”方案。目前本工程正在施工中。
|
关 键 词: | 勘测 设计 自强水电站 |
Summary of preliminary design of Ziqiang hydropower project |
| |
Authors: | Wu Zhengxin Hou Kaixiang |
| |
Abstract: | The preliminary design report on Ziqiang hydropower project was examined in Feb, 2005. The project is a diversion type power station which is mainly used for power generating with flood control. After the comprehensive comparison of dam site, clam type, powerhouse site and power conduit system, the ahernative consisting of a rubble concrete adopted finally. The project is under construction at present. |
| |
Keywords: | investigation design Ziqiang hydropower project |
本文献已被 维普 等数据库收录! |