We consider a single machine scheduling problem with resource dependent release times that can be controlled by a non-increasing convex resource consumption function. The objective is to minimize the weighted total resource consumption and sum of job completion times with an initial release time greater than the total processing times. It is known that the problem is polynomially solvable in O(n4) with n the number of jobs.  相似文献   

2.
We consider two single machine scheduling problems with resource dependent release times that can be controlled by a non-increasing convex resource consumption function. In the first problem, the objective is to minimize the total resource consumption with a constraint on the sum of job completion times. We show that a recognition version of the problem is NP-complete. In the second problem, the objective is to minimize the weighted total resource consumption and sum of job completion times with an initial release time greater than the total processing times. We provide some optimality conditions and show that the problem is polynomially solvable.  相似文献   

3.
We consider resource allocation scheduling with learning effect in which the processing time of a job is a function of its position in a sequence and its resource allocation. The objective is to find the optimal sequence of jobs and the optimal resource allocation separately. We concentrate on two goals separately, namely, minimizing a cost function containing makespan, total completion time, total absolute differences in completion times and total resource cost; minimizing a cost function containing makespan, total waiting time, total absolute differences in waiting times and total resource cost. We analyse the problem with two different processing time functions. For each combination of these, we provide a polynomial time algorithm to find the optimal job sequence and resource allocation.  相似文献   

4.
In many resource allocation problems in physical or economic systems, a linear resource consumption function is commonly considered, and job processing times are assumed to be fixed parameters. However, the former assumption fails to reflect the law of diminishing returns, and the latter may be controlled by changing the allocation of resources to jobs. Motivated by these observations, we provide a unified model for solving single-machine scheduling problems in which each job's processing time is a function of its starting time and convex resource allocation. The objective is to find the optimal sequence of jobs subject to a limited resource consumption. We first show how this unified model can be useful in solving scheduling problems under due date assignment considerations. We analyze the problem with four different due date assignment methods, and our objective function includes costs for earliness, tardiness and due date assignments. We also consider scheduling problems without involving due date assignment decisions. The objective function is to minimize the makespan, total completion time, total absolute variation in completion times, and total absolute variation in waiting times. We show that several existing well-known problems can be reduced to a special case of our unified model and solved in O(nlogn) time.  相似文献   

5.
We address the problem of sequential single machine scheduling of jobs with release times, where jobs are classified into types, and the machine must be properly configured to handle jobs of a given type. The objective is to minimize the maximum flow time (time from release until completion) of any job. We consider this problem under the assumptions of sequence independent set-up times and item availability with the objective of minimizing the maximum flow time. We present an online algorithm that is O(1)-competitive, that is, always gets within a constant factor of optimal. We also show that exact offline optimization of maximum flow time is NP-hard.  相似文献   

6.
In various industries jobs undergo a batching, or burn in, process where different tasks are grouped into batches and processed simultaneously. The processing time of each batch is equal to the longest processing time among all jobs contained in the batch. All to date studies dealing with batching machines have considered fixed job processing times. However, in many real life applications job processing times are controllable through the allocation of a limited resource. The most common and realistic model assumes that there exists a non-linear and convex relationship between the amount of resource allocated to a job and its processing time. The scheduler?s task when dealing with controllable processing times is twofold. In addition to solving the sequencing problem, one must establish an optimal resource allocation policy. We combine these two widespread models on a single machine setting, showing that both the makespan and total completion time criteria can be solved in polynomial time. We then show that our proposed approach can be applied to general bi-criteria objective comprising of the makespan and the total completion time.  相似文献   

7.
In a manufacturing or service system, the actual processing time of a job can be controlled by the amount of an indivisible resource allocated, such as workers or auxiliary facilities. In this paper, we consider unrelated parallel-machine scheduling problems with discrete controllable processing times. The processing time of a job is discretely controllable by the allocation of indivisible resources. The planner must make decisions on whether or how to allocate resources to jobs during the scheduling horizon to optimize the performance measures. The objective is to minimize the total cost including the cost measured by a standard criterion and the total processing cost. We first consider three scheduling criterions: the total completion time, the total machine load, and the total earliness and tardiness penalties. If the number of machines and the number of possible processing times are fixed, we develop polynomial time algorithms for the considered problems. We then consider the minimization problem of the makespan cost plus the total processing cost and present an integer programming method and a heuristic method to solve the studied problem.  相似文献   

8.
We consider a strongly NP-hard calendar planning problem with constraints on resource consumption and job ordering. One characteristic feature of our problem setting is that resource consumption intensities by different jobs may change during their processing, and resource availability depends on time. To solve the problem, we construct an integer programming model and develop a dynamic programming algorithm. We distinguish a special case of the problem that can be solved in pseudopolynomial time. We show numerical experiments on randomly generated test examples.  相似文献   

9.
In the paper two resource constrained single-machine group scheduling problems with both learning effects and deteriorating jobs are considered. By learning effects, deteriorating jobs and group technology assumption, we mean that the processing time of a job is defined by the function of its starting time and position in the group, and the group setup times of a group is a positive strictly decreasing continuous function of the amount of consumed resource. We present polynomial solutions for the makespan minimization problem under the constraint that the total resource consumption does not exceed a given limit, and the total resource consumption minimization problem under the constraint that the makespan does not exceed a given limit, respectively.  相似文献   

10.
闫杨  王大志  汪定伟  王洪峰 《控制与决策》2008,23(12):1413-1416
讨论具有连续资源的单机成组排序问题.这一模型中同一组内的工件不允许分开加工,各工件组的安装时间是所消耗资源的非负减少连续函数.工件的加工时问是开工时问的严格减少函数.针对满足资源消耗总量限制条件下极小化最大完工时问的问题.以及在满足最大完工时间限制条件下极小化资源消耗总量的问题,讨论了最优排序的某些特征,分别给出了求解最优资源分配的方法.最后通过数值例子表明了所提出方法的正确性和有效性.  相似文献   

11.
本文研究的连续型批处理机调度问题, 是在钢铁工业管坯的加热过程中提出来的. 工件带有释放时间和工期, 工件进入和离开机器是按周期依次进行的. 本文针对单机连续型批调度问题中工件释放时间和工期同序的情况, 分析了极小化最大拖期和拖期工件数等问题的计算复杂性, 证明了两类问题都是强NP-难的. 对于工件的释放时间和加工时间、工期都同序的特殊情况, 分别给出了能够获得对应问题的最优解的多项式算法.  相似文献   

12.
赵晓丽  宫华  车平 《自动化学报》2020,46(1):168-177
研究了两个工件集合竞争在一台批处理机上加工的调度问题,其中每个集合的工件具有一个共同的释放时间.批处理机可以同时加工多个工件作为一批,每批的加工时间为该批工件中加工时间的最大值.基于两类释放时间的大小,针对无界批处理机上最小化一个集合工件的最大完工时间、最大延迟以及总完工时间,使得另一个集合工件的最大完工时间不超过给定上界问题,分别给出了最优求解方法.针对有界批处理机上最小化一个集合工件的最大完工时间,使得另一个集合工件的最大完工时间不超过给定上界问题,证明为一般意义NP-难问题,并给出伪多项式时间最优求解方法.  相似文献   

13.
In this paper, we consider scheduling of deteriorating jobs on a single machine with slack (SLK) due date assignment, resource allocation, and a rate‐modifying activity. The rate‐modifying activity can change jobs’ processing rates such that the actual processing time of a job depends on whether the job is processed before or after the rate‐modifying activity. In addition, the actual processing time of a job also depends on its position in a processing sequence (i.e., the aging effect) and the amount of resource allocated to it. The objective is to determine the optimal sequence, optimal common flow allowance, optimal resource allocation, and optimal location of the rate‐modifying activity to minimize a total penalty function comprising the earliness, tardiness, common flow allowance, and resource allocation costs. We consider two variants of the problem associated with two different processing time functions and provide a polynomial‐time algorithm to solve each variant.  相似文献   

14.
朱洁  李雯睿  赵红  李滢 《计算机应用》2015,35(12):3383-3386
针对目前层级队列作业调度算法中资源占比高的作业执行效率低的问题,提出一种资源匹配最大集算法。该算法分析作业特征,引入完成度、等待时间、优先级、重调度次数为紧迫值因子,优先考虑资源占比高或等待时间长的作业,以改善作业公平性;采用双队列结构在可用资源总量内优先选择高紧迫值作业,在不同资源占比作业集比较中选择作业数最大集,以实现调度平衡。在与最大最小公平(Max-min fairness)算法的实例对比中发现,该算法可降低作业集平均等待时间、提高资源利用率。实验对比结果表明,该算法可将不同资源占比的单一类型作业集执行时间缩短18.73%,其中资源占比高的作业执行时间缩短27.26%;在混合型作业集中对应的执行时间可分别缩短22.36%与30.28%。所提算法能有效减少资源占比高作业的等待,提高作业整体执行效率。  相似文献   

15.
We consider the problem of scheduling a set of jobs on a system that offers certain resource, wherein the amount of resource offered varies over time. For each job, the input specifies a set of possible scheduling instances, where each instance is given by starting time, ending time, profit and resource requirement. A feasible solution selects a subset of job instances such that at any timeslot, the total requirement by the chosen instances does not exceed the resource available at that timeslot, and at most one instance is chosen for each job. The above problem falls under the well-studied framework of unsplittable flow problem on line. The generalized notion of scheduling possibilities captures the standard setting concerned with release times and deadlines. We present improved algorithms based on the primal–dual paradigm, where the improvements are in terms of approximation ratio, running time and simplicity.  相似文献   

16.
We revisit the classic problem of preemptive scheduling on m uniformly related machines. In this problem, jobs can be arbitrarily split into parts, under the constraint that every job is processed completely, and that the parts of a job are not assigned to run in parallel on different machines. We study a new objective which is motivated by fairness, where the goal is to minimize the sum of the two maximal job completion times. We design a polynomial time algorithm for computing an optimal solution. The algorithm can act on any set of machine speeds and any set of input jobs. The algorithm has several cases, many of which are very different from algorithms for makespan minimization (algorithms that minimize the maximum completion time of any job), and from algorithms that minimize the total completion time of all jobs.  相似文献   

17.
We consider single-machine batch delivery scheduling with an assignable common due date and controllable processing times, which vary as a convex function of the amounts of a continuously divisible common resource allocated to individual jobs. Finished jobs are delivered in batches and there is no capacity limit on each delivery batch. We first provide an O(n5) dynamic programming algorithm to find the optimal job sequence, the partition of the job sequence into batches, the assigned common due date, and the resource allocation that minimize a cost function based on earliness, tardiness, job holding, due date assignment, batch delivery, and resource consumption. We show that a special case of the problem can be solved by a lower-order polynomial algorithm. We then study the problem of finding the optimal solution to minimize the total cost of earliness, tardiness, job holding, and due date assignment, subject to limited resource availability, and develop an O(nlog n) algorithm to solve it.  相似文献   

18.
一类资源约束的单机成组调度问题   总被引:1,自引:0,他引:1  
本文讨论具有连续资源的单机成组调度问题.在这一模型中,工件组的安装时间是所消耗资源的非负严格减少连续函数,工件的加工时间是开工时间的严格增加函数.考虑两个问题,第1个问题是在满足资源消耗总量限制条件下,极小化最大完工时间.第2个问题的目标函数是在满足最大完工时间限制条件下,极小化资源消耗总量.分别对两个问题讨论了最优调度的某些特征,分别给出了求解最优资源分配的方法,并通过数值例子进行说明.  相似文献   

19.
This paper is about scheduling parallel jobs, i.e. which can be executed on more than one machine at the same time. Malleable jobs is a special class of parallel jobs. The number of machines a malleable job is executed on may change during its execution.In this work, we consider the NP-hard problem of scheduling malleable jobs to minimize the total weighted completion time (or mean weighted flow time). For this problem, we introduce the class of “ascending” schedules in which, for each job, the number of machines assigned to it cannot decrease over time while this job is being processed.We prove that, under a natural assumption on the processing time functions of jobs, the set of ascending schedules is dominant for the problem. This result can be used to reduce the search space while looking for an optimal solution.  相似文献   

20.
研究了带有简单线性恶化工件和释放时间的两个代理单机调度问题. 所有工件在一台机器上加工, 每个代理有各自依赖于自己工件的优化目标. 针对工件释放时间相同与不同两种情况, 研究了有约束的优化模型, 即找到调度最小化一个代理的目标函数而使得另一个代理的目标函数不超过一个给定的上界. 当工件具有相同的释放时间, 我们主要考虑的目标函数有: 总加权完工时间和总加权拖期工件数. 当工件具有不同释放时间, 我们考虑的目标函数有: 最大完工时间、总完工时间以及拖期工件数. 对于每一个问题, 我们分析了问题的计算复杂性. 此外, 对于NP难问题的一些特殊情况本文分析了最优解性质, 基于这些性质给出了最优算法.  相似文献   