首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
This paper deals with a stochastic group shop scheduling problem. The group shop scheduling problem is a general formulation that includes the other shop scheduling problems such as the flow shop, the job shop and the open shop scheduling problems. Both the release date of each job and the processing time of each job on each machine are random variables with known distributions. The objective is to find a job schedule which minimizes the expected makespan. First, the problem is formulated in a form of stochastic programming and then a lower bound on the expected makespan is proposed which may be used as a measure for evaluating the performance of a solution without simulating. To solve the stochastic problem efficiently, a simulation optimization approach is developed that is a hybrid of an ant colony optimization algorithm and a heuristic algorithm to generate good solutions and a discrete event simulation model to evaluate the expected makespan. The proposed approach is tested on instances where the random variables are normally, exponentially or uniformly distributed and gives promising results.  相似文献   

2.
王春  王艳  纪志成 《控制与决策》2019,34(5):908-916
针对不确定多目标柔性作业车间调度问题,将工序加工时间采用区间数表示,以区间最大完工时间和区间机器总负荷为优化目标,构建多目标区间柔性作业车间调度模型,并设计一种多目标进化优化算法对该模型进行求解.算法采用混合策略生成初始化种群,并采用贪婪插入法对染色体进行解码,通过基于可能度的占优关系评价个体性能,将区间目标归一化结合拥挤距离反映优化解的分布情况.实验结果验证了所提出算法的有效性.  相似文献   

3.
吴贝贝  张宏立  王聪  马萍 《控制与决策》2021,36(5):1181-1190
为了求解具有多目标多约束的柔性作业车间调度问题,提出一种基于正态云模型的状态转移算法.构建以最小化最大完工时间、机器总负荷及瓶颈机器负荷为目标的多目标柔性作业车间调度问题的数学模型;针对灰熵关联度适应度分配策略在Pareto解比较序列与参考序列之间的差值相等时不能引导算法进化的情况,提出一种改进灰熵关联度的适应度值分配策略;同时引入兼具模糊性和随机性的云模型进化策略以改进状态转移算法,可有效避免算法早熟并增加候选解的多样性.仿真结果表明:基于正态云模型的状态转移算法能够有效解决多目标柔性作业车间调度问题;与其他算法相比,所提出算法求解问题的收敛精度更高、收敛速度更快.  相似文献   

4.
A scheduling system is proposed and developed for a special type of flow shop. In this flow shop there is one machine at each stage. A job may require multiple operations at each stage. The first operation of a job on stage j cannot start until the last operation of the job on stage j - 1 has finished. Pre-emption of the operations of a job is not allowed. The flow shop that the authors consider has another feature, namely time lags between the multiple operations of a job. To move from one operation of a job to another requires a finite amount of time. This time lag is independent of the sequence and need not be the same for all operations or jobs. During a time lag of a job, operations of other jobs may be processed. This problem originates from a flexible manufacturing system scheduling problem where, between operations of a job on the same workstation, refixturing of the parts has to take place in a load/unload station, accompanied by (manual) transportation activities. In this paper a scheduling system is proposed in which the inherent structure of this flow shop is used in the formulation of lowerbounds on the makespan. A number of lowerbounds are developed and discussed. The use of these bounds makes it possible to generate a schedule that minimizes makespan or to construct approximate solutions. Finally, some heuristic procedures for this type of flow shop are proposed and compared with some well-known heuristic scheduling rules for job shop/flow shop scheduling.An earlier version of this paper was presented at the First International Conference on Industrial Engineering and Production Management 1993, 2–4 June 1993, Mons, Belgium.  相似文献   

5.
Dynamic job shop scheduling that considers random job arrivals and machine breakdowns is studied in this paper. Considering an event driven policy rescheduling, is triggered in response to dynamic events by variable neighborhood search (VNS). A trained artificial neural network (ANN) updates parameters of VNS at any rescheduling point. Also, a multi-objective performance measure is applied as objective function that consists of makespan and tardiness. The proposed method is compared with some common dispatching rules that have widely used in the literature for dynamic job shop scheduling problem. Results illustrate the high effectiveness and efficiency of the proposed method in a variety of shop floor conditions.  相似文献   

6.
This paper investigates an integrated optimisation problem of production scheduling and preventive maintenance (PM) in a two-machine flow shop with time to failure of each machine subject to a Weibull probability distribution. The objective is to find the optimal job sequence and the optimal PM decisions before each job such that the expected makespan is minimised. To investigate the value of integrated scheduling solution, computational experiments on small-scale problems with different configurations are conducted with total enumeration method, and the results are compared with those of scheduling without maintenance but with machine degradation, and individual job scheduling combined with independent PM planning. Then, for large-scale problems, four genetic algorithm (GA) based heuristics are proposed. The numerical results with several large problem sizes and different configurations indicate the potential benefits of integrated scheduling solution and the results also show that proposed GA-based heuristics are efficient for the integrated problem.  相似文献   

7.
Due to the limited applicability in practice of the classical job shop scheduling problem, many researchers have addressed more complex versions of this problem by including additional process features, such as time lags, setup times, and buffer limitations, and have pursued objectives that are more practically relevant than the makespan, such as total flow time and total weighted tardiness. However, most proposed solution approaches are tailored to the specific scheduling problem studied and are not applicable to more general settings. This article proposes a neighborhood that can be applied for a large class of job shop scheduling problems with regular objectives. Feasible neighbor solutions are generated by extracting a job from a given solution and reinserting it into a neighbor position. This neighbor generation in a sense extends the simple swapping of critical arcs, a mechanism that is widely used in the classical job shop but that is not applicable in more complex job shop problems. The neighborhood is embedded in a tabu search, and its performance is evaluated with an extensive experimental study using three standard job shop scheduling problems: the (classical) job shop, the job shop with sequence-dependent setup times, and the blocking job shop, combined with the following five regular objectives: makespan, total flow time, total squared flow time, total tardiness, and total weighted tardiness. The obtained results support the validity of the approach.  相似文献   

8.
求解工件车间调度问题的一种新的邻域搜索算法   总被引:8,自引:1,他引:7  
王磊  黄文奇 《计算机学报》2005,28(5):809-816
该文提出了一种新的求解工件车间调度(job shop scheduling)问题的邻域搜索算法.问题的目标是:在满足约束条件的前提下使得调度的makespan尽可能地小.定义了一种新的优先分配规则以生成初始解;定义了一种新的邻域结构;将邻域搜索跟单机调度结合在一起;提出了跳坑策略以跳出局部最优解并且将搜索引向有希望的方向.计算了当前国际文献中的一组共58个benchmark问题实例,算法的优度高于当前国外学者提出的两种著名的先进算法.其中对18个10工件10机器的实例,包括最著名的难解实例ft10,在可接受的时间内都找到了最优解.这些实例是当前文献中报导的所有规模为10工件10机器的实例.  相似文献   

9.
改进离散粒子群算法求解柔性流水车间调度问题   总被引:1,自引:0,他引:1  
徐华  张庭 《计算机应用》2015,35(5):1342-1347
针对以最小化完工时间为目标的柔性流水车间调度问题(FFSP),提出了一种改进离散粒子群(DPSO)算法.所提算法重新定义粒子速度和位置的相关算子,并引入编码矩阵和解码矩阵来表示工件、机器以及调度之间的关系.为了提高柔性流水车间调度问题求解的改进离散粒子群算法的初始群体质量,通过分析初始机器选择与调度总完工时间的关系,首次提出一种基于NEH算法的最短用时分解策略算法.仿真实验结果表明,该算法在求解柔性流水车间调度问题上有很好的性能,是一种有效的调度算法.  相似文献   

10.
This paper presents a two-stage genetic algorithm (2S-GA) for multi-objective Job Shop scheduling problems. The 2S-GA is proposed with three criteria: Minimize makespan, Minimize total weighted earliness, and Minimize total weighted tardiness. The proposed algorithm is composed of two Stages: Stage 1 applies parallel GA to find the best solution of each individual objective function with migration among populations. In Stage 2 the populations are combined. The evolution process of Stage 2 is based on Steady-State GA using the weighted aggregating objective function. The algorithm developed can be used with one or two objectives without modification. The genetic algorithm is designed and implemented with the GALIB object library. The random keys representation is applied to the problem. The schedules are constructed using a permutation with m-repetitions of job numbers. Performance of the proposed algorithm is tested on published benchmark instances and compared with results from other published approaches for both the single objective and multi-objective cases. The experimental results show that 2S-GA is effective and efficient to solve job shop scheduling problem in term of solution quality.  相似文献   

11.
The paper considers a three-machine shop scheduling problem to minimize the makespan, in which the route of a job should be feasible with respect to a machine precedence digraph with three nodes and one arc. For this NP-hard problem that is related to the classical flow shop and open shop models, we present a simple 1.5-approximation algorithm and an improved 1.4-approximation algorithm.  相似文献   

12.
Scheduling jobs under decreasing linear deterioration   总被引:1,自引:0,他引:1  
This paper considers the scheduling problems under decreasing linear deterioration. Deterioration of a job means that its processing time is a function of its execution start time. Optimal algorithms are presented respectively for single machine scheduling of minimizing the makespan, maximum lateness, maximum cost and number of late jobs. For two-machine flow shop scheduling problem to minimize the makespan, it is proved that the optimal schedule can be obtained by Johnson's rule. If the processing times of operations are equal for each job, flow shop scheduling problems can be transformed into single machine scheduling problems.  相似文献   

13.
In this paper, we present a particle swarm optimization for multi-objective job shop scheduling problem. The objective is to simultaneously minimize makespan and total tardiness of jobs. By constructing the corresponding relation between real vector and the chromosome obtained by using priority rule-based representation method, job shop scheduling is converted into a continuous optimization problem. We then design a Pareto archive particle swarm optimization, in which the global best position selection is combined with the crowding measure-based archive maintenance. The proposed algorithm is evaluated on a set of benchmark problems and the computational results show that the proposed particle swarm optimization is capable of producing a number of high-quality Pareto optimal scheduling plans.  相似文献   

14.
屈国强 《信息与控制》2012,(4):514-521,528
针对以最小化时间表长为目标的复杂混合流水车间调度问题,提出了一种将机器布局和工件加工时间特征紧密结合的启发式算法.首先,充分利用各阶段平均机器负荷一般不相等的特点确定瓶颈阶段,构建初始工件排序.其次,针对在瓶颈阶段前加工时间较短而瓶颈阶段后加工时间相对较长的工件,在第1阶段优先开始加工.同时,在瓶颈阶段前的每一个阶段,每当有工件等待加工或同时完工时,优先选择瓶颈阶段前剩余加工时间最短的工件加工;在瓶颈阶段以及瓶颈阶段之后,则优先选择这台机器后剩余加工时间最长的工件加工.最后,采用工件交换和插入操作改进初始调度.用Carlier和Neron的Benchmark算例测试提出的启发式算法.将计算结果与NEH启发式算法进行了比较,平均偏差降低了0.0555%,表明这个启发式算法是有效的.  相似文献   

15.
Dynamic flexible job shop scheduling problem is studied under the events such as new order arrivals, changes in due dates, machine breakdowns, order cancellations, and appearance of urgent orders. This paper presents a constructive algorithm which can solve FJSP and DFJSP with machine capacity constraints and sequence-dependent setup times, and employs greedy randomized adaptive search procedure (GRASP). Besides, Order Review Release (ORR) mechanism and order acceptance/rejection decisions are also incorporated into the proposed method in order to adjust capacity execution considering customer due date requirements. The lexicographic method is utilized to assess the objectives: schedule instability, makespan, mean tardiness and mean flow time. A group of experiments is also carried out in order to verify the suitability of the GRASP in solving the flexible job shop scheduling problem. Benchmark problems are formed for different problem scales with dynamic events. The event-driven rescheduling strategy is also compared with periodical rescheduling strategy. Results of the extensive computational experiment presents that proposed approach is very effective and can provide reasonable schedules under event-driven and periodic scheduling scenarios.  相似文献   

16.
This paper addresses the stable scheduling of multi-objective problem in flexible job shop scheduling with random machine breakdown. Recently, numerous studies are conducted about robust scheduling; however, implementing a scheme which prevents a tremendous change between scheduling and after machine breakdown (preschedule and realized schedule, respectively) can be critical for utilizing available resources. The stability of the schedule can be detected by a slight deviation of start and completion time of each job between preschedule and realized schedule under the uncertain conditions. In this paper, two evolutionary algorithms, NSGA-II and NRGA, are applied to combine the improvement of makespan and stability simultaneously. A simulation approach is used to evaluate the state and condition of the machine breakdowns. After the introduction of the evaluation criteria, the proposed algorithms are tested on a variety of benchmark problems. Finally, through performing statistical tests, the algorithm with higher performance in each criterion is identified.  相似文献   

17.
张先超  周泓 《控制与决策》2016,31(6):1087-1092

研究在设备故障环境下调度目标为工期的期望-风险准则多阶段流水车间鲁棒调度问题. 以期望工期和工期标准差分别作为调度性能和风险的度量, 求解这样的鲁棒调度方案, 使得期望工期尽可能满意的同时降低风险. 在详细描述问题的基础上, 研究问题的性质, 对量子进化算法进行改进来求解该鲁棒调度问题. 计算实验表明, 在机器可能发生故障的情况下, 期望-风险准则多阶段流水车间的鲁棒调度能够获得满意的性能和鲁棒性.

  相似文献   

18.
针对面向绿色制造的车间调度问题,考虑能源消耗、最大完工时间、生产成本等调度目标,建立了多目标柔性作业车间调度问题模型,并提出一种改进离散蝙蝠算法来求解。针对这个模型的特点,为了有效地表达出工序与粒子种群之间的关系,提出一种整数编码策略。为了避免粒子早熟收敛、求解精度低等问题,设计了一种具有记忆能力的粒子变异操作。为了克服基本蝙蝠算法固定参数不足的缺点,重新调整惯性权重的值,提出一种线性递减的惯性权重策略。针对具体生产实例进行验证,实验数据表明,该改进算法在求解多目标柔性作业车间调度问题上具有良好的性能,是一种有效的调度算法。  相似文献   

19.
贺利军  李文锋  张煜 《控制与决策》2020,35(5):1134-1142
针对现有多目标优化方法存在的搜索性能弱、效率低等问题,提出一种基于灰色综合关联分析的多目标优化方法.该多目标优化方法采用单目标优化算法构建高质量的参考序列,计算参考序列与优化解的目标函数值序列之间的灰色综合关联度,定义基于灰色综合关联度的解支配关系准则,将灰色综合关联度作为多目标优化算法的适应度值.以带顺序相关调整时间的多目标流水车间调度问题作为应用对象,建立总生产成本、最大完工时间、平均流程时间及机器平均闲置时间的多目标函数优化模型.提出基于灰色关联分析的多目标烟花算法,对所建立的多目标优化模型进行优化求解.仿真实验表明,所提出多目标烟花算法的性能优于3种基于不同多目标优化方法的烟花算法及两种经典多目标算法,验证了所提出的多目标优化方法及多目标算法的可行性和有效性.  相似文献   

20.
具有线性恶化加工时间的调度问题   总被引:11,自引:0,他引:11  
讨论了工件具有线性恶化加工时间的调度问题.在这类问题中,工件的恶化函数为线性 函数.对单机调度问题中目标函数为极小化最大完工时间加权完工时间和,最大延误以及最大费 用等问题分别给出了最优算法.对两台机器极小化最大完工时间的Flowshop问题,证明了利用 Johnson规则可以得到最优调度.对于一般情况,如果同一工件的工序的加工时间均相等,则 Flowshop问题可以转化为单机问题.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号