首页 | 本学科首页   官方微博 | 高级检索  
     

卢安夏矿巴卢巴选矿厂复产的生产实践
引用本文:付和生,刘亚平.卢安夏矿巴卢巴选矿厂复产的生产实践[J].有色金属工程,2011,1(1):47-49.
作者姓名:付和生  刘亚平
作者单位:北京矿冶研究总院;中色卢安夏铜业有限公司
摘    要:针对卢安夏铜矿原有浮选工艺中存在的问题进行工艺改造。采用调整磨矿细度、改造浮选工艺流程、改变工艺参数及药剂制度等措施,在原矿含铜1.30%、含钴0.105%的情况下,铜回收率由90.75%提高到93.43%,铜精矿品位由16.88%提高到21.04%,钴精矿品位由0.90%提高到1.12%,提高了选矿技术指标。

关 键 词:铜矿  浮选  磨矿细度  流程改造  药剂制度
收稿时间:3/7/2011 12:00:00 AM

Review on Rehabilitation of Luanshya Buluba Concentrator
FU He-sheng and LIU Ya-ping.Review on Rehabilitation of Luanshya Buluba Concentrator[J].Nonferrous Metals Engineering,2011,1(1):47-49.
Authors:FU He-sheng and LIU Ya-ping
Affiliation:Beijing General Research Institute of Mining and Metallurgy;CNMC Luanshya Copper Mines PLC
Abstract:The flotation process to improve the initial one of LCM copper mine was introduced. Under the condition of 1.3% copper feed grade and 0.105% cobalt grade, with the application of a series of measures including adjusting the particle fineness of milling ore, reforming the flotation process , adjusting process parameters and improving reagent system, the copper recovery was improved from 90.75% to 93.43%, the grade of copper concentrate was raised from 16.88% to 21.04% and that ofcobalt concentrate was raised from 0.9% to 1.12%,. As a result, all flotation technical parameters were improved.
Keywords:copper mine  flotation  milled particle fineness  process reform  reagent administration
点击此处可从《有色金属工程》浏览原始摘要信息
点击此处可从《有色金属工程》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号