首页 | 本学科首页   官方微博 | 高级检索  
     

螺旋锚和土工合成材料修复膨胀土渠坡实例
作者姓名:王钊  邱宗强  蔡松桃  胡怀亮  崔伯军  鲁跃
作者单位:1. 武汉大学,土木建筑工程学院,武汉,430072
2. 河南省南阳引丹灌区管理局,河南,邓州,474100
3. 河南省水利科学研究院,郑州,450003
4. 河南省农田水利水土保持技术推广站,郑州,450003
5. 江苏九鼎集团,江苏,如皋,226500
6. 捷高科技有限公司,北京,100022
摘    要:介绍了玻璃钢螺旋锚、土工格栅、土工泡沫和土工合成材料黏土垫(GCL)在修复河南邓州市膨胀土渠道滑坡中的应用。玻璃钢螺旋锚用来锚固水上坡的混凝土框架梁和水下坡的混凝土板,土工格栅提高渠坡抗整体滑动的安全系数,土工泡沫用以减小混凝土板衬砌下的膨胀力,GCL用作混凝土板下的防渗垫层。文中给出设计方法、监测方案和修复工程的竣工情况,还将玻璃钢螺旋锚方案与其他修复方法,如换填非膨胀土法、抗滑桩法以及土工格栅分层加筋法做了技术和经济比较,说明了该法的优越性。

关 键 词:玻璃钢  螺旋锚  土工合成材料  修复  渠道渠坡  膨胀土
文章编号:1672-1683(2007)05-0127-05
修稿时间:2007-08-27

A Case History of Application of FRP Screw Anchor and Geosynthetics in Repairing of Canal Slope of Expansive Soils
Authors:WANG Zhao  QIU Zong-qiang  CAI Song-tao  HU Huai-liang  CUI Bai-jun  LU Yue
Affiliation:1. School of Civil and Architectural Eng. ,Wuhan Univ. ,Wuhan 430072,China; 2. Henan Nanyang Bureau of Yindanlrrigation District, Henan Dengzhou 474100, China ; 3. Henan Provincial Water Conservancy Research Institute, Zhengzhou 450003, China ; 4. Henan Province Irrigation and Water Conservation of Water and Soil Technical Promotion Station Zhengzhou 450003, China; 5. Jiangsu J iuding Group ,Rugao 226500, China ; 6. CETCO, Beijing 100022, China
Abstract:The application of FRP screw anchor,geogrid,geofoam slab and geosynthetics clay liner(GCL) in repairing slide of canal slope of expansive soils has been introduced in this paper.The FRP screw anchor was used to anchor the concrete frame girder above the berm and concrete slab below the berm,the geogrid improved the factor of safety against complete sliding surface,the geofoam slab was used to reduce the expansive force under the concrete slab and GCL was used as seepage prevention liner under the concrete slab.And.The paper presents a design method,a monitoring plan and information of post-construction for this project.The technical and economic comparisons of the application of FRP screw anchor with other schemes such as non-swelling soil replacement method,anti-slide pile and reinforcement of geogrid in layers prove that this scheme is priority method.
Keywords:FRP  screw anchor  geosynthetics  repair  slide of canal slope  expansive soil
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号