排序方式: 共有8条查询结果,搜索用时 15 毫秒
1
1.
2.
3.
4.
The measurement system is the main equipment of the project.Based on the characteristic of experiment system,a sensor array is designed,and used to continually acquire the global magnetic field.A scientific scheme is developed to get the signal processing and temperature compensation for nondirective weak magnetic field.The software of sampling control system is given,which is complied using C language in Labwindows/CVI.Taking computer as main engine,the system can acquire the nondirective weak magnetic field automatically and continuously use the sensor array,the change of magnetic field can be shown in real-time and intuitively. 相似文献
5.
Thermomechanical coupling of PVC sheet with defects under uniaxial loading at different rates and different sizes of microbores was studied.The local temperature field of the dynamic damage-rupture process zone at crack tip was surveyed with infrared thermographic sensor.Based on the irreversible thermomechanics theory,the dissipation law of deformation-heat effect during the whole process was found.Furthermore,the effect of thermoelasticity in the initial stage of extension was explained. 相似文献
6.
7.
在招标设计阶段,对水布垭导流隧洞设计进行了大量的设计优化研究工作。主要有:导流洞进口设计优化,将进水塔上移,减少进口明挖量,隧洞断面设计优化,改城门洞形断面为修正马蹄形,优化了隧洞的受力条件;隧洞衬砌设计优化,改全断面钢筋混凝土衬砌为分段设计的组合衬砌形式,节省了衬砌工程量,隧洞出口设计优化,缩短消力池长度,优化出口消力池施工,度汛防护方案。 相似文献
8.
1